Days between dates

Count calendar days, weekdays, and weeks between any two dates — no signup.

By LemCall Editorial
Calendar days
30
Weekdays (Mon–Fri)
22
Weeks
4.3

A surprising amount of scheduling work comes down to counting days. How many calendar days until a deadline, how many weekdays a project takes, how many full weeks between a kickoff and a launch — all the same arithmetic, all easy to fumble in a spreadsheet because of inclusive vs exclusive endpoints, leap years, and weekend handling.

This calculator computes three numbers from any pair of dates: total calendar days, weekday-only days (Monday–Friday), and full weeks. It excludes the start date and includes the end date by default, matching the convention used by most project-management tools. For country-specific public-holiday adjustments, use the working-days calculator instead.

Frequently asked questions

Are weekends counted in the weekday total?
No. Weekdays counts Monday through Friday only. Weekends and public holidays are excluded.
Is the start or end date included?
End date is included, start date is excluded — the same convention used by GitHub, Linear, and most PM tools. A start of Mon and end of Tue equals 1 day.
Does this account for public holidays?
Weekday-only mode doesn't. Use the working-days calculator for country-specific public-holiday adjustments.

Sources

  1. 1.ISO. ISO 8601-1:2019 Date and time — Representations for information interchange
  2. 2.ECMA-262. ECMAScript Date specification (Time Values and Time Range)

Encrypted in transit

TLS on every request

Unlimited team members

Flat rate, no per-seat fees

Two-way calendar sync

Google and Outlook

Timezone accurate

DST-safe slots worldwide

Live status page

Real service health

LemCall

The modern scheduling platform with flat-rate pricing. Stop paying per seat, start saving.

Built with by LemStudio

Use Cases

© 2026 LemCall by LemStudio. All rights reserved.

v2026-09-09System status